Completed July 2015. This is a new 2 canopy site. A separate Heavy vehicle forecourt comprising 4 Gallagher Pulse Ultra dispensers. Each dispenser has 6 hoses, 2 Ultimate Diesel, 2 Standard Diesel and 2…...
View DetailsThis is a the First Puma Travel Centre in NSW on the Pacific Highway bypass at Kempsey. Site opened in May 2015 Equipment used Double wall Fiberglass Tank Solution tanks…...
View DetailsCompleted June 2014. This is an existing site that has had a major upgrade, New Diesel forecourt added and a total revamp of the Fuel forecourt. Equipment used Gallagher Pulse…...
View DetailsThis is a new Caltex Truck Stop. Equipment used Double wall Tank Solution tanks FE Petro Submersible pumps Nupi Fuel system pipework Nupi electrical conduit Gilbarco SK700 pumps Veeder Root…...
View DetailsThis was an existing site that had the Tanks, Pumps and underground pipe work replaced. Equipment used Double wall Envirotanks Red Jacket submersible pumps Nupi Fuel system pipework Nupi electrical…...
View DetailsThis is an existing site that required a VR1 upgrade to meet the EPA Clean Air Regulations that came into force on the 1st January 2014. Equipment used Shipman King…...